Projects
Company |
John Paul Construction |
|
Project |
Sandyford Central Project |
|
Duration |
15 months |
|
Project Value |
€566,000 |
|
Architect |
|
|
Engineer |
O’Connor Sutton Cronin |
|
Work |
This was a rapid build 564 Apartment development across six Blocks. Tara Steel fabricated and installed Stair Balustrades, Curved Glass Balustrades, Aluminium Flashing & Access Stairs. Tara Steel co-ordinated closely with the Main Contractor to achieve delivery on a tight schedule. |
Company |
Collen Construction |
|
Project |
Alto Frascati |
|
Duration |
18 months |
|
Project Value |
€1,073,000 |
|
Architect |
|
|
Engineer |
Barrett Mahony Consulting |
|
Work |
This was a prestigious high end apartment development. Tara Steel fabricated and installed external stainless steel glazed balustrade, roof garden screen, external structural stairs with integrated glazed balustrade, maintenance access and Corten lighting feature. Our Team had to design the external elements to withstand a corrosive marine environment with strong wind loadings. |
Extent of steel erected by Tara Steel
Company |
BAM Construction |
|
Project |
New Childrens Hospital |
|
Duration |
48 months |
|
Project Value |
€3,100,000 |
|
Architect |
|
|
Engineer |
O’Connor Sutton Cronin & Roughan & O’Donovan |
|
Work |
Tara Steel supplied the secondary steel structure; co-ordinating with the Main Contractor, Architects and Engineers in 3D BIM Modelling system.The site had in excess of one thousand personnel. Working through the pandemic, Tara Steel overcame a number of logistical challenges to provide our client with the smooth delivery and installation of product. |
Company |
BAM Construction |
Project |
DAA Airport Tower |
Duration |
6 months |
Project Value |
€280,000+ |
Architect |
Scott, Tallon & Walker |
Engineer |
Arup Partners |
Work |
Tara was presented with a particular challenge to achieve curved flashings and a façade in the round control tower. We created specific tooling to fabricate the curved façade. This was complemented by structural glass balustrading above the façade and curved handrailing in stainless steel. Finish in aluminium powder coating, with hidden fixings. |
Company |
Flynn Management Ltd |
Project |
Irish Life, Lower Abbey Street, Dublin 1 |
Duration |
7 months |
Project Value |
€250,000+ |
Architect |
BSLArch & Fitzgerald Kavanagh + Partners |
Work |
Design, fabrication and installation of internal façade for lift shaft, in powder coated, perforated aluminium. |
Company |
Collen Construction Ltd |
Project |
AUDI, Sandyford, South Dublin |
Duration |
3 months |
Project Value |
€100,000+ |
Architect |
EMD Architects |
Work |
Tara was commissioned to develop S/S vehicle barriers on the first floor of the showroom, strong enough to withstand vehicular impact yet sufficiently stylish to be consistent with the luxury car brand’s showroom fitout. Audi also commissioned Tara to deliver structural glass balustrading for the escalators, S/S and glass balustrading on the feature stairs, |