Projects

Company

John Paul Construction

Project

Sandyford Central Project

Duration

15 months

Project Value

€566,000

Architect

Henry J Lyons Architects

Engineer

O’Connor Sutton Cronin

Work

This was a rapid build 564 Apartment development across six Blocks. Tara Steel fabricated and installed Stair Balustrades, Curved Glass Balustrades, Aluminium Flashing & Access Stairs.

Tara Steel co-ordinated closely with the Main Contractor to achieve delivery on a tight schedule.

Company

Collen Construction

Project

Alto Frascati

Duration

18 months

Project Value

€1,073,000

Architect

Reddy Architecture + Urbanism

Engineer

Barrett Mahony Consulting

Work

This was a prestigious high end apartment development. Tara Steel fabricated and installed external stainless steel glazed balustrade, roof garden screen, external structural stairs with integrated glazed balustrade, maintenance access and Corten lighting feature. Our Team had to design the external elements to withstand a corrosive marine environment with strong wind loadings.

Extent of steel erected by Tara Steel

Company

BAM Construction

Project

New Childrens Hospital

Duration

48 months

Project Value

€3,100,000

Architect

BDP / O’Connell Mahon / Coady Architects

Engineer

O’Connor Sutton Cronin & Roughan & O’Donovan

Work

Tara Steel supplied the secondary steel structure; co-ordinating with the Main Contractor, Architects and Engineers in 3D BIM Modelling system.The site had in excess of one thousand personnel. Working through the pandemic, Tara Steel overcame a number of logistical challenges to provide our client with the smooth delivery and installation of product.  

Company

BAM Construction

Project

DAA Airport Tower

Duration

6 months

Project Value

280,000+

Architect

Scott, Tallon & Walker

Engineer

Arup Partners

Work

Tara was presented with a particular challenge to achieve curved flashings and a façade in the round control tower. We created specific tooling to fabricate the curved façade. This was complemented by structural glass balustrading above the façade and curved handrailing in stainless steel. Finish in aluminium powder coating, with hidden fixings.

 Company

Flynn Management Ltd

Project

Irish Life, Lower Abbey Street, Dublin 1

Duration

7 months

Project Value

250,000+

Architect

BSLArch & Fitzgerald Kavanagh + Partners

Work

Design, fabrication and installation of internal façade for lift shaft, in powder coated, perforated aluminium.

Company

Collen Construction Ltd

Project

AUDI, Sandyford, South Dublin

Duration

 3 months

Project Value

100,000+

Architect

EMD Architects

Work

Tara was commissioned to develop S/S vehicle barriers on the first floor of the showroom, strong enough to withstand vehicular impact yet sufficiently stylish to be consistent with the luxury car brand’s showroom fitout. Audi also commissioned Tara to deliver structural glass balustrading for the escalators, S/S and glass balustrading on the feature stairs,